BRICK APPIANO

Between innovation and tradition, the project defines the interaction of the sports center “Angelo Moratti” with the external area. A new brick building hosts the concierge, surveillance, new toilet facilities dedicated to the viewers of the training sessions and provides controlled access to a new space dedicated to the fans.

Within it, a small fully glazed structure can accommodate both a store dedicated to visitors both events related to promotional activities of the club.

The redevelopment project of the historic AC Milanello Sports Center begins with the characterization of the main building. The interventions involve reception spaces, service to the first team and those dedicated to guests, thus renewing the identity of one of the most important clubs in the world.

The project represented the first stage of Dontstop architecture consulting for the AC Milan Club.

The “Branding Appiano” project involves the graphic treatment of the buildings of the Sports Center in Appiano Gentile redefining a new landscape of buildings coordinated with each other in colors and materials.

The project includes a new coloring of the entire Piramide building with the introduction of FC Internazionale colors, the relocation of the historical dedication plate of the center to “Angelo Moratti” near the entrance and the realization of a new big company logo. The entrances and paths are all themed and in dialogue with each other.

The internal graphics project for the New Gym in Appiano Gentile is part of the “Branding Appiano” intervention. The project is characterized by a series of great sportsmen’s aphorisms placed on the walls perimeter associated with blue and black shapes and FC Internazionale emblems. The project recall the team’s colors.

The project foresees the darkening of the perimeter of the main Camp and of the secondary camp through a system of inflatable elements.

This solution is temporary, the elements must not be anchored to the ground by any foundation, but only a ballast on the ground through the insertion of removable prefabricated weights at the inflatable elements base. Each modular element can be inflated and deflated in about five minutes.

© 2024 Dontstop architettura snc
A Mab21 website
casibomcasibomcasibomcasibomcasibomcasibomcasibomcasibomcasibomcasibomcasibomcasibombahsegelcasibomcasibomcasibomBetgarantiPerabetcasibomcasibomcasibomcasibomcasibomhttps://x.com/Casibom_tr_trhttps://twitter.com/Casibom_tr_trcasibom